Friday, March 4, 2011

YESSSS!!!!




It feels like a milestone has been reached with the outdoor area being concreted. Now back to tile selection and finding a tiler. Hopefully the Metricon tiler will be available to do the job.
In case your wondering what's going on with the rear pillar. I've changed the metal down pipe for plastic 90mm storm water pipe. Why you might ask? I think it looks better and they don't ping with water droplets in light rain like metal. The colour change to Ironstone is to give some contrast.

No comments:

Post a Comment