Plastering Day 3




Here we are on day 3 of the plastering with all the walls and ceilings sheeted and plaster applied to the joins and corners. First two pictures are of the modified ensuite and the final picture is of the garage showing the inbuilt storage which will also house the alarm and networking equipment.

Plasterers mentioned they'd be working Saturday as well to do the cornices and start sanding, not sure if that still applies.

Had a chat with the boss of the plasterers and advised him we are having floor to ceiling tiles in the ensuite and that we didn't want the tiles to be flush with the cornice. His solution was simple, they'll leave off the cornice in ensuite until the tiling is done. What's important to know out of this is if I hadn't flagged this with my SS the tiles would have been flush to the edge of the cornice which I think looks cheap and makes the whole thing look like an afterthought. Don't assume Metricon will always do what looks best, ask and tell them what you want and why!