Wednesday, May 12, 2010

Facade Roof Flashing Complete


Finally all the roof is waterproof but not without some problems. The colourbond steel that makes up the flat part of the roof above that large front awning window I discovered is very scratched and has a crease in it. Scratched as in down to bare metal in one part. Also the old outside light versus down pipe issue appeared...lol down pipe always wins. With no time left I was able to move the outside light wiring myself to another suitable location.

2 comments:

  1. Hi Charlie

    I see that you are building with M'con on the GC. When did you sign the contract with Metricon? I am trying to get an idea of how long Metricon is taking in QLD (as against what they promise) to make a site start?

    Drew

    ReplyDelete
  2. Hi Drew

    Xmas new year got in the road a little but contract was signed on 7th of Jan 2010 and earthworks commenced on the 1st of March 2010. For us this was a little faster than our sales consultant predicted. Any other questions feel free to ask.

    Charlie

    ReplyDelete